comp., MSschedule performance index The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPIindeks prestasi jadual (SPI)
comp., MSWeb Performance Test EditorEditor Ujian Web (The Visual Studio editor in which a Web test is edited. It displays a tree structure of request nodes)
comp., MSWeb Performance Test Result ViewerAlat Lihat Ujian Web (A Visual Studio window where Web tests are run and results are displayed)