DictionaryForumContacts

   English
Terms for subject Microsoft containing performance | all forms | exact matches only
EnglishMalay
on-chip performance counterpengira prestasi pada cip (A register on a CPU chip that stores very low-level information. This information can be queried)
performance testujian prestasi (A procedure used to assess performance)
schedule performance index The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPIindeks prestasi jadual (SPI)
Web Performance Test EditorEditor Ujian Web (The Visual Studio editor in which a Web test is edited. It displays a tree structure of request nodes)
Web Performance Test Result ViewerAlat Lihat Ujian Web (A Visual Studio window where Web tests are run and results are displayed)